A Texas mechanics lien is a statutory claim tied to unpaid construction labor, materials, specially fabricated materials, certain design services, yard and grounds work, or demolition on private real property. Who may claim, which notices are required and when the affidavit is due depend on the claimant's role and on whether the project is residential or non-residential. Under Texas Property Code Chapter 53 (opens in a new tab), as changed by House Bill 2237 (opens in a new tab) effective January 1, 2022, a claimant who is not the original contractor generally sends the unpaid-work notice by the 15th day of the third month after the month of work on a non-residential project, and by the 15th day of the second month on a residential project. The lien affidavit generally follows by the fourth month on non-residential projects and the third month on residential ones. A foreclosure suit generally must be filed by the first anniversary of the last affidavit-filing day. Homestead and public projects add their own rules, and the exact deadline turns on the claimant category, the type of claim, the project classification and the contract dates.
Key takeaways
- Private-property liens come from Property Code Chapter 53; public projects use payment-bond claims under Government Code Chapter 2253 instead.
- Subcontractors and suppliers send a notice by the 15th day of the third month (non-residential) or second month (residential) after the month of work.
- The lien affidavit is filed with the county clerk by the 15th day of the fourth month (non-residential) or third month (residential), with a copy sent within five days.
- Homestead property has extra written-contract, notice and constitutional requirements.
- A foreclosure suit generally must be filed by the first anniversary of the last affidavit-filing day, with a limited written extension.
- Whether a particular lien is valid, timely and enforceable is a separate legal question.
Who may have Texas mechanics lien rights?
Section 53.021 (opens in a new tab) gives lien rights to a person who, under a contract with the owner or the owner's agent, trustee, receiver, contractor or subcontractor, does any of the following:
- Labors or furnishes labor or materials for construction or repair of an improvement.
- Specially fabricates material, even if it is not delivered.
- Is a licensed design professional, such as an engineer or surveyor, preparing a design, drawing, plan, plat, survey or specification.
- Provides labor, plant material or other supplies for yard and grounds work, including specified related installations.
- Performs labor for, or furnishes labor or materials for, demolition of an improvement.
Section 53.021 also treats a person who works under a direct contract with a purported original contractor as an original contractor for perfection purposes, and section 53.026 (opens in a new tab) addresses subcontractor relationships and the treatment of certain claimants as original contractors. Chapter 53's procedures still control how a lien is perfected. Belonging to a covered category does not by itself show that a particular claim is timely or enforceable.
An original contractor deals directly with the owner. A subcontractor, supplier or laborer working under someone else's contract is a derivative claimant, and the notice rules below are written mainly for that group.
Which deadline applies to the notice?
For projects governed by the current text, section 53.056 (opens in a new tab) sets the unpaid-work notice:

- Original contractor. Chapter 53 generally does not impose the section 53.056 notice, although the original contractor must meet the affidavit, homestead, retainage and other requirements.
- Non-residential project. The notice goes to the owner or reputed owner and the original contractor by the 15th day of the third month after the month in which the labor or materials were provided, or after the month in which undelivered specially fabricated materials would normally have been delivered.
- Residential project. The same notice is due by the 15th day of the second month after that month.
Section 53.056(a-2) prescribes a notice form that must be substantially followed, including the project description, claimant, labor or materials, original contractor, contracting party if different, and claim amount. Section 53.003 (opens in a new tab) allows delivery in person, by certified mail, or by another traceable private delivery or mailing service that confirms proof of receipt, and depositing certified mail generally satisfies the delivery rule unless receipt is specifically required. Retainage has its own notice rule in section 53.057 (opens in a new tab).
Before House Bill 2237, the notice rules differed, including a second-month notice for certain claimants and additional third-month notices. The current text applies to projects and claims governed by the January 1, 2022 amendments.
When must the lien affidavit be filed?
The affidavit is filed with the county clerk of the county where the improvements are located. Section 53.052 (opens in a new tab) sets these deadlines, each falling on the 15th day of the month shown:
Hover or tap a row to highlight it.
| Claim | Affidavit deadline (15th day of the month shown) |
|---|---|
| Original contractor, non-residential | Fourth month after completion, termination or abandonment |
| Original contractor, residential | Third month after completion, termination or abandonment |
| Other claimant, non-residential | Fourth month after the later of last work or expected delivery |
| Other claimant, residential | Third month after the later of last work or expected delivery |
| Retainage claim | Generally third month after the original contract is completed, terminated or abandoned |
What must the affidavit say, and what happens after filing?
Section 53.054 (opens in a new tab) requires the affidavit to contain, substantially:
- A sworn statement of the amount claimed.
- The owner or reputed owner's name and last known address.
- A general statement of the work or materials and, for a claimant other than the original contractor, the months for which payment is claimed.
- The name and address of the person who hired the claimant or received the labor or materials.
- The original contractor's name and last known address.
- A legally sufficient property description.
- The claimant's name, mailing address and physical address if different.
- For a claimant other than the original contractor, the dates and methods used to send the required notices.
After filing, section 53.055 (opens in a new tab) requires a copy to go to the owner or reputed owner within five days, and to the original contractor within the same period if the filer is not the original contractor. Recording fees are set by each county. Houston County's recording fee schedule (opens in a new tab), revised January 1, 2024, lists $25 for the first page of a real-property record and $4 for each additional page with visible marks. That is one dated county example, not a statewide fee; the county clerk where the property is located can confirm the current amount.
How a subcontractor or supplier claim moves under Chapter 53
- Month of workThe subcontractor or supplier provides labor or materials in a given month and is not paid.
- Notice of claimBy the 15th day of the third month (non-residential) or second month (residential), notice goes to the owner or reputed owner and the original contractor.
- Lien affidavitBy the 15th day of the fourth month (non-residential) or third month (residential), the affidavit is filed with the county clerk where the improvements are located.
- Copies sentWithin five days after filing, a copy goes to the owner or reputed owner and to the original contractor.
- Foreclosure suitSuit is brought by the first anniversary of the last day the affidavit could be filed, unless a recorded written agreement extends it.
What changes for a Texas homestead?
Homestead construction liens are governed by Property Code subchapter K (sections 53.251 to 53.260 (opens in a new tab)) and by Texas Constitution article XVI, section 50 (opens in a new tab). The main requirements include:

- A homestead lien for work the constitutional provision covers generally requires a written contract.
- The contract must be signed by both spouses if a married couple owns the homestead, subject to constitutional exceptions.
- The contract must be made before the labor or materials are provided, by the owner or an authorized agent.
- The Constitution requires the contract to be acknowledged and recorded in the county records as article XVI, section 50(a)(5) specifies.
Subchapter K also covers required homestead notices (section 53.255), the owner's right to cancel certain residential construction contracts (section 53.256), lender disclosures (section 53.257), the owner's affidavit (section 53.258), false or misleading affidavits (section 53.259), and a ban on requiring an owner to convey the property as a condition of a residential construction contract (section 53.260). These requirements are separate from the month-based deadlines, so whether the property is a homestead matters before ordinary residential-project procedures are applied. TexasLawHelp's contractor page (opens in a new tab) also explains homestead contract and notice protections.
What does retainage do?
Section 53.101 (opens in a new tab) requires an owner to retain 10 percent of the contract price or the value of the work for the statutory retainage period. Section 53.103 gives a lien on reserved funds when the claimant sends the required notices on time and files an affidavit by the deadline, generally not later than the 30th day after the original contract is completed, terminated or abandoned, subject to exceptions. Sections 53.104 to 53.106 cover the retainage period, notice of retainage and an owner's liability for failing to retain funds.
Sections 53.081 through 53.083 cover notices and withholding for claims. Under section 53.082, withheld funds stay withheld until the claim is settled, discharged, indemnified against or found invalid by final judgment, until the affidavit-filing time passes, or until a filed claim is satisfied or released.
Hover or tap a row to highlight it.
| Item | Rule or figure | Section |
|---|---|---|
| Copy of filed affidavit | Within five days after filing | 53.055 |
| Response to an owner's information request | Within a reasonable time, no later than the 10th day after receipt | 53.159 |
| Statutory retainage | 10 percent of the contract price or value of the work | 53.101 |
| Foreclosure suit | First anniversary of the last affidavit-filing day | 53.158(a) |
| Written extension of the foreclosure period | Not past the second anniversary of the affidavit filing date | 53.158(a-2) |
How long does the lien remain subject to enforcement?
Under section 53.158(a) (opens in a new tab), a foreclosure suit must be brought no later than the first anniversary of the last day on which the claimant could file the lien affidavit under section 53.052. Subsection (a-2) allows a written agreement with the then-current record owner to extend the period, but not past the second anniversary of the date the claimant filed the affidavit. The agreement must be recorded with the clerk of the same county where the lien was recorded, and it operates as notice to a later purchaser.
House Bill 2237 amended section 53.158 effective January 1, 2022. The statute supplies the limitations period for a foreclosure action; it does not establish that a recorded lien is enforceable. The statutory owner notice says the affidavit is not itself a lien and that a court may impose a lien if the claim is successfully enforced.
How can a lien be released or bonded off?
A lien can be addressed by a voluntary release or waiver under subchapter L, a bond to indemnify against the lien under subchapter H (or the subchapter K procedures for residential property), an owner's statutory demand for release where Chapter 53 covers it, or a court proceeding on validity, discharge or enforcement.

Section 53.171 (opens in a new tab) lets a property owner or other eligible party file a bond to indemnify against liens. Section 53.172 requires the bond to describe the property, identify each lien, meet the statutory amount formula, be payable to the lien claimants and be executed by the principal and an authorized corporate surety. The bond does not decide whether the underlying payment claim is valid; it substitutes a bond for the property as the security the statute addresses.
What does a lien waiver release?
Sections 53.281 through 53.287 (opens in a new tab) govern statutory waivers and releases.
- Section 53.281 makes a waiver and release unenforceable unless it is executed and delivered under subchapter L. It takes effect only if it substantially complies with a section 53.284 form, is signed by the claimant or an authorized agent and, for a conditional release, evidence of payment exists.
- Section 53.282 makes a statement that purports to waive, release or impair a lien or payment-bond claim generally unenforceable unless it is written, substantially complies with the statutory form and the claimant received payment in full in good and sufficient funds. It recognizes a limited pre-work contractual waiver for certain single-family houses, townhouses and duplexes.
- Section 53.283 prohibits requiring an unconditional waiver and release for a progress or final payment unless the claimant received that amount in good and sufficient funds.
- Section 53.284 prescribes four forms: conditional and unconditional waivers on progress payment, and conditional and unconditional waivers on final payment.
A conditional waiver becomes effective when its stated payment condition is met, such as a check being properly endorsed and paid by the bank. The statute asks for substantial compliance with the forms, not word-for-word identity.
What if the project is public?
Texas Government Code Chapter 2253 (opens in a new tab) governs payment bonds for public works. A payment bond protects people who supply labor or materials for public work, since a private-property lien is not the ordinary remedy against government-owned property. Section 2253.021 requires a payment bond for certain public works contracts, and sections 2253.041 through 2253.048 address bond claims and notices. Section 2253.076 limits claims (a retainage claim is capped at the retainage the contract specifies and never more than 10 percent of the relevant contract amount), section 2253.077 sets venue in a county where part of the public work is located, and section 2253.078 addresses limitations for suit on the bond. Property Code subchapter J (sections 53.231 through 53.237) also has public-works lien and bond provisions that are read with the Government Code requirements.
Can a lien be filed without a lawyer?
Chapter 53 does not say a lawyer must file a lien affidavit. Several procedural points tend to decide whether a self-prepared filing holds up:

- Classifying the claimant and the project correctly, and using the right residential or non-residential deadline.
- Meeting the monthly notice deadline and recording the notice dates and delivery methods.
- Including a legally sufficient property description.
- Mailing the filed affidavit on time and accounting for homestead requirements.
- Signing an accurate affidavit and using waiver and release forms that substantially comply with the statute.
- Calendaring the foreclosure deadline and keeping a public payment-bond claim separate from a private-property lien.
A Texas construction lawyer can advise on a specific claim. The Texas State Law Library catalog (opens in a new tab) lists a Texas mechanics-lien guide that covers perfection, foreclosure, bonds, trust funds and forms.
What do owners do after receiving a notice?
An owner who receives a notice or sees a recorded affidavit is usually asking whether funds must be withheld, what the recording means and how to release or bond it. Sections 53.081 through 53.083 and 53.101 through 53.106 address withholding. Section 53.159 gives an owner-side timing rule for information requests, requiring a response within a reasonable time and no later than the 10th day after receipt. Section 53.171 covers bonding against the lien, and subchapter L covers releases.
Check what you know about Texas mechanics liens
Frequently asked questions
These answers cover questions readers often ask after the steps above.
Who can claim a Texas mechanics lien?
Section 53.021 covers labor or materials for construction or repair, specially fabricated materials, licensed design professionals, such as engineers and surveyors, providing specified services, yard and grounds labor or supplies, and demolition labor or materials. Each is subject to the statute's requirements.
Where is the lien affidavit filed?
It is filed with the county clerk in the county where the improvements are located. Each county sets its own recording fee.
How long does a Texas mechanics lien last?
Section 53.158 generally requires a foreclosure suit by the first anniversary of the last day the claimant could file the affidavit. A written agreement with the record owner can extend that, but not past the second anniversary of the filing date.
Next step
If you want to talk with a Texas law firm about a construction payment question, you can browse firms by city and practice area in our Texas lawyer directory. The rules and figures above are current as of October 1, 2026 and can change.
Terms in this guide
Tap a term to see what it means.
Original contractor. A person who contracts directly with the property owner or the owner's agent for the work.
Derivative claimant. A subcontractor, supplier or laborer whose claim comes through someone else's contract rather than a direct contract with the owner.
Lien affidavit. The sworn claim filed with the county clerk; the Texas statutory owner notice says it is not itself a lien and that a court may impose a lien if the claim is successfully enforced.
Homestead. A family's protected home; in Texas, a homestead lien for covered work generally needs a written contract made before the work begins.
Retainage. Money an owner holds back from contract payments; Texas Property Code section 53.101 requires the owner to retain 10 percent for the statutory period.
Bond to indemnify. A bond filed with a corporate surety that replaces the property as the security for a lien claim.
Conditional waiver. A lien waiver that takes effect only when its stated payment condition is met, such as a check being paid by the bank.
Payment bond. A bond on a public works project that protects people who supply labor or materials, used in place of a lien on government property.
This guide gives general legal information, not legal advice for your situation. Laws change and differ by state; a lawyer licensed in your state can tell you how they apply to you.